Monday, July 5, 2010

Work day at the Church of Monett

The Church of Monett [building!] has a few problems ... one of which is a leaky basement that has caused a mold issue.  Over the last few days, the men have pooled together their resources, skills and time to do a lot of much-needed maintenance to the church house.  The drains were cleaned and snaked, lights replaced, water damaged ceiling tile replaced with dry-wall, the sides of the church were built up with the hopes of channeling the rain away from the building, window wells were installed, the back parking area was built up with more dirt, and more.

Brianna, the un-official photographer, was on hand with her camera.









0 comments:

Post a Comment

Comments are moderated and will be posted as soon as possible. Thank you!